- Collaborators: Eleuterio Nicolás
On the other wing we placed the technical premises for the theatre, public services and the bar, connected to the foyer and with the possibility to run independently from the theatre. The pavements were enlarged absorving the loading areas, giving more space to the public in front of the main entrance and providing the bar with a pleasant terrace. The only alteration of the existing volume corresponded to the stage box, on the top of which we hid the air conditioning machinery as well as the solar panels. The stage had to technical bridges and the floor consisted of a modular set of removable pieces to allow for scenographic effects. The Green Room, a key piece to the functioning and organization of a stage was next to the stairs which led to the dressing rooms on the first floor.